Service 07 · Demolition
A well run demolition leaves a clean, safe site on time. 22 Civil provides residential, commercial and industrial demolition across Sydney and NSW, with asbestos removal and civil works under the same roof.
In house
Asbestos and demolition, one team
No second contractor, no handover delay.
Every job
Demolition work plan and SWMS
ISO 45001 certified safety system.
What we demolish
From a backyard pool to a full industrial site, scoped and quoted the same way.
Core service
Full demolition for knockdown rebuilds, duplexes and redevelopment.
02
Offices, shops, warehouses and mixed use buildings.
03
Factories, sheds and plant structures.
04
Removing part of a structure while protecting what remains.
05
Soft strip of fit outs, ceilings, partitions and services.
06
Concrete breaking and removal.
07
Trees, vegetation, sheds and debris.
How it runs
Eight stages, one team, one point of contact from quote to handover.
01
Approvals, hazardous materials survey and site constraints reviewed.
02
We work to your DA or CDC and notify SafeWork NSW where required.
03
Electricity, gas, water and telecommunications coordinated.
04
Licensed asbestos removal before demolition.
05
Fencing, hoarding, dust and noise controls, neighbour protection.
06
Structured, mechanical or hand demolition to a documented work plan.
07
Concrete, brick, steel and timber recovered where possible.
08
A clean, level site ready for earthworks or construction.
Asbestos and demolition together
Asbestos must be removed and cleared before demolition starts. We remove it, obtain the clearance certificate and move straight into demolition with the same team and plant.
Most Sydney demolition happens next to occupied homes and businesses. We plan for it with dust suppression, noise within approved hours, vibration awareness, boundary protection and clear notice of disruptive works. Where required, dilapidation reports are coordinated first.
Materials are separated on site and sent for recycling wherever practical. The rest is classified and disposed of at licensed facilities, with dockets kept for your records. ISO 14001 certified.
Demolition is high risk construction work. Every job has a demolition work plan and site specific SWMS, under ISO 45001 safety and ISO 9001 quality systems.
FAQ
Yes. Demolition usually needs development consent or a complying development certificate. We can advise what documents we need before starting.
Most standard house demolitions take [one to two weeks] on site, depending on size, access and asbestos. We confirm timing in the quote.
Yes. We hold the licence to remove asbestos and do so before demolition begins, with a clearance certificate issued.
We coordinate disconnection of electricity, gas, water and telecommunications with the relevant providers before demolition.
Materials are separated on site and recycled where possible. The rest is disposed of at licensed facilities.
Get a demolition quote
Related services
Often booked with demolition
03 · Earthworks
06 · Asbestos Removal